Joshua Boniface
d2a5fe59c0
Use a pair of transitional states, "takeover" and "relinquish", when transitioning between primary and secondary coordinator states. This provides a clsuter-wide record that the nodes are still working during their synchronous transition states, and should allow clients to determine when the node(s) have fully switched over. Also add an additional 2 seconds of wait at the end of the transition jobs to ensure everything has had a chance to start before proceeding. References #72 |
||
---|---|---|
.. | ||
pvcnoded | ||
pvc-flush.service | ||
pvc.target | ||
pvcnoded.py | ||
pvcnoded.sample.yaml | ||
pvcnoded.service |